BAIR MC6-KRC4 = B1 + IR1
Content
B1: – Safety devices on the injection molding machine – Configuration of the machine control unit and core-pulling program – Procedure for setting up the machine – Setting up the clamping unit and programming core-pulling processes – Setting up the injection unit and determining the basic settings, mold filling study – Optimization of machine settings – Monitoring options – Error messages and event log – Practical exercises on simulators and machines IR1 KRC4: – Setup and operation of a KraussMaffei robot system (KUKA) – Moving robots, reading and interpreting messages from the robot control system – Operation with VisuX – Programming with ProgTechX – Using robot programs – Handling program files, creating program modules – Creating and changing programmed movements, generating new movement commands
Targets
– Effective setup of injection molding machines – Quick and safe operation of injection molding machines – Quick and reliable programming of core-pulling processes – Recognition and independent handling of error messages – The objective of the training is to gain all the essential skills required to operate and create simple handling tasks for the KraussMaffei robot system (KUKA).
Prerequisites
– Participation in our practical training KS – Basic knowledge of the injection molding process
BAIR MC6-KRC4 = B1 + IR1
2.525,00 €
Duration: | 5 days, each day from 8:30 a.m. to 4:30 p.m. |
Target group: | Machine operators, toolsetters, foremen, sampling personnel with advanced automation tasks, automation personnel |